What kind of bizarre thinking is this? There is surprise that a laptop released at the end of October is not built with a chip released in September?? WTF? Even <i>if</i> the chip is fully 100% slot compatible, neither MS nor Apple would or could take that at face value. The power requirements are different, that alone is cause for a redesign of the board.<p>The author seems to be living in a fantasy land, it takes time to test, purchase the processors, build the laptops, ship the laptops, and I'm sure I'm missing about 10 other bottlenecks in the process. The Pascal GPU was only released in May, and that is still too soon to have been designed around.<p>Missing are examples of computers that have shipped in high volume using 1-4 months old components. Missing is some realization that if both MS & Apple are doing the same thing, there's probably a good reason.