To a non-engineering manager or non-SRE, this may seem absurd.<p>We do these in a more planned way where I work and call them "fire drills".<p>Everything prod should be HA and evict-able from a particular server, rack, and/or DC floor and survive. If it's not, it's a sign something is wrong.<p>The goal isn't fun, it's to find corner cases and places that aren't HA by meatcloud, chaos monkey-style.<p>Ideally, lights-out PDUs and Ethernet switch port control can simulate "pulling plugs" in an automated way and do so remotely and more cheaply.<p>If you bought a company, maybe you'd do this once to get a baseline, but with the express intention of not doing it for fun or to be a jerk.