TE
科技回声
首页24小时热榜最新最佳问答展示工作
GitHubTwitter
首页

科技回声

基于 Next.js 构建的科技新闻平台,提供全球科技新闻和讨论内容。

GitHubTwitter

首页

首页最新最佳问答展示工作

资源链接

HackerNews API原版 HackerNewsNext.js

© 2025 科技回声. 版权所有。

Google purchases nuclear energy from Kairos Power SMRs

1 点作者 espadrine7 个月前

2 条评论

espadrine7 个月前
Five years to build each SMR is faster than what it takes to build a typical EPR (from 10 to 20 years), but it is still longer than what I expected. Besides, the 5-year figure might have overruns as they work through regulatory hoops towards a permit.<p>Nevertheless, before even having one built, it will allow Google to say that large model training will eventually not produce CO2.
brudgers7 个月前
recently, <a href="https:&#x2F;&#x2F;news.ycombinator.com&#x2F;item?id=41840769">https:&#x2F;&#x2F;news.ycombinator.com&#x2F;item?id=41840769</a>