“Hinkley Point C was initially set to cost £18bn and to be completed in 2025, but the estimated cost has since swelled to roughly £46bn in 2024 terms while the start date has been pushed back to 2029 at the earliest, because of construction delays.”<p>I’m no fan of opponents of nuclear based on safety and waste disposal arguments but boy do the cost arguments carry a lot of weight. How can these costs ever compete with renewables plus storage?