'National Grid ESO underusing batteries'

1 点作者 zeristor大约 1 个月前

3 条评论

zeristor大约 1 个月前
So is the issue that the uk National Grid hasn’t really had software updated to make the most of grid battery storage.<p>I follow the grid several times a day, and whilst I can clearly see the power drain and support for pumped hydro; there’s no equivalent for grid battery storage.<p>How long before all the grid battery storage that has been built is actually being used?<p>Or is it being used in a different manner.
评论 #43597683 未加载
zeristor大约 1 个月前
I’ve always thought that the key place to build grid battery storage is at the intersection between power lines.<p>Power can be moved there off peak ready for usage; I’m guessing that at peak times there’s not much additional capacity for power to be delivered.
zeristor大约 1 个月前
National Grid Electricity System Operator (ESO) is consistently underusing batteries, even when they are the cheapest and fastest solution to meet the needs of the GB grid.