> And it’s being built without any government subsidies.<p>Important milestone there.
It's great to see that green energy projects are largely economically feasible without subsidies these days.
From Google:<p>The turbine model V236-15.0 MW from Vestas features a capacity of 15 MW and a 236-meter diameter rotor with hub height of about 145 meter, highest tip of 263 meter.<p>... 236 meters